Extending life expectancy of La Esmeralda reservoir: A bet to support Colombia's future energy demand

    Research output: Chapter in Book/Report/Conference proceedingConference and proceedingspeer-review

    5 Scopus citations

    Abstract

    This work addresses the strategy of AES Corporation (AES Chivor) in order to extend the life of La Esmeralda reservoir to support Colombia's future energy demand. Chivor Hydropower Plant entered into service in 1978 and has a capacity of 1000 MW, 8 % of Colombia's demand. It is first described how the Colombian electricity energy mix is composed. Then, La Esmeralda reservoir, which is used by Chivor for power generation, is described; sediment management plans and maintenance costs for equipment and infrastructure are addressed. Then, sediment dynamics studies that have been done in order to determine life expectancy of La Esmeralda reservoir are listed. Such studies have been used to execute the Chivor's Life Extension Project, which considers the modification of intakes as the best option to extend the life of the reservoir for at least 50 years, among several alternatives that were evaluated by a panel of international experts. This represents a challenge from the engineering point of view, and the project will be shown as a successful example for a country with such dependence on hydropower generation. Modernizing existing infrastructure without affecting the operation, as in this case, is crucial to show how a sustainable sediment management plan and technological development are necessary to extend life of hydropower generation projects, and to help meeting energy demand in a sustainable way for countries such as Colombia with a growing economy.

    Original languageEnglish
    Title of host publicationASME 2020 Power Conference, POWER 2020, collocated with the 2020 International Conference on Nuclear Engineering
    PublisherAmerican Society of Mechanical Engineers (ASME)
    ISBN (Electronic)9780791883747
    DOIs
    StatePublished - 2020
    Event2019 Canadian Society for Civil Engineering Annual Conference, CSCE 2019 - Laval, Canada
    Duration: 12 Jun 201915 Jun 2019

    Publication series

    NameAmerican Society of Mechanical Engineers, Power Division (Publication) POWER
    Volume2020-August

    Conference

    Conference2019 Canadian Society for Civil Engineering Annual Conference, CSCE 2019
    Country/TerritoryCanada
    CityLaval
    Period12/06/1915/06/19

    Bibliographical note

    Publisher Copyright:
    Copyright © 2020 ASME.

    Fingerprint

    Dive into the research topics of 'Extending life expectancy of La Esmeralda reservoir: A bet to support Colombia's future energy demand'. Together they form a unique fingerprint.

    Cite this