Abstract
The deploying of FiWi networks is a problem that occurs often in real situations and requires is simplified through optimal planning. For this work we considered a scenario of urban dwellings with smart meters (SM), devices that need to be managed from a central office (CO) of an electric utility, with a advanced metering infrastructure forming a neighborhood area network (NAN). Therefore, it has raised a heuristic process due to, the a combinatorial problem property. The Heuristics poses the optimum location of cellular base stations (BS) for obtain the wireless connectivity to each smart meter (SM) , the next stage propose the optimal location of a CO with optical fiber link between each BS, and include optical splitters that will be used for each section of fiber to achieve full connectivity of the BS and a the point of metropolitan area network (MAN) equivalent to central office of an electric utility with the minimum cost by optical fiber used.
| Original language | English |
|---|---|
| Article number | 8015053 |
| Pages (from-to) | 1684-1690 |
| Number of pages | 7 |
| Journal | IEEE Latin America Transactions |
| Volume | 15 |
| Issue number | 9 |
| DOIs | |
| State | Published - 2017 |
Bibliographical note
Publisher Copyright:© 2003-2012 IEEE.
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Costs
- deployment
- heuristics
- optimization
- planning
- smart grid
Fingerprint
Dive into the research topics of 'Optimal Planning for Deployment of FiWi Networks based on Hybrid Heuristic Process'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver