TY - JOUR
T1 - Chivor’s life extension project (Clep)
T2 - From sediment management to development of a new intake system
AU - Del Río, David A.
AU - Moffett, Hugo
AU - Nieto-Londoño, César
AU - Vásquez, Rafael E.
AU - Escudero-Atehortúa, Ana
N1 - Publisher Copyright:
© 2020 by the authors. Licensee MDPI, Basel, Switzerland.
PY - 2020/10
Y1 - 2020/10
N2 - Sedimentation is an important issue that has been studied for the watershed of reservoirs, since it increases operational costs of hydropower installations, reduces the life expectancy, and compromises the generation capacity due to volume reduction. This work addresses the implementation of Chivor’s Life Extension Project (CLEP), developed in order to extend the life of La Esmeralda reservoir, which is used for power generation in Colombia. Sediment dynamics studies are first described and connected to the need of the AES Corporation to extend the life expectancy of the Chivor Hydropower Project. The geotechnical and hydraulic designs are described and the main considerations and tools for the execution of such a project are addressed. The construction of the new intake system was developed under favorable geomorphological, geological, and hydrogeological conditions, and the project is being developed without affecting the current operation. Such an innovative project is the first of its class in Colombia and goes from studies of sediment transport and sediment management strategies in the watershed to the design and construction of new intakes, in order to extend the life of an existing 1000-MW (6% of Colombia’s demand) powerplant for 50 more years, contributing to a sustainable energy supply for the future.
AB - Sedimentation is an important issue that has been studied for the watershed of reservoirs, since it increases operational costs of hydropower installations, reduces the life expectancy, and compromises the generation capacity due to volume reduction. This work addresses the implementation of Chivor’s Life Extension Project (CLEP), developed in order to extend the life of La Esmeralda reservoir, which is used for power generation in Colombia. Sediment dynamics studies are first described and connected to the need of the AES Corporation to extend the life expectancy of the Chivor Hydropower Project. The geotechnical and hydraulic designs are described and the main considerations and tools for the execution of such a project are addressed. The construction of the new intake system was developed under favorable geomorphological, geological, and hydrogeological conditions, and the project is being developed without affecting the current operation. Such an innovative project is the first of its class in Colombia and goes from studies of sediment transport and sediment management strategies in the watershed to the design and construction of new intakes, in order to extend the life of an existing 1000-MW (6% of Colombia’s demand) powerplant for 50 more years, contributing to a sustainable energy supply for the future.
KW - Hydropower
KW - Hydropower infrastructure
KW - Hydropower renovation
KW - Renewable energy systems
KW - Reservoir sedimentation
KW - Sustainable energy
UR - http://www.scopus.com/inward/record.url?scp=85092731127&partnerID=8YFLogxK
U2 - 10.3390/w12102743
DO - 10.3390/w12102743
M3 - Artículo en revista científica indexada
AN - SCOPUS:85092731127
SN - 2073-4441
VL - 12
JO - Water (Switzerland)
JF - Water (Switzerland)
IS - 10
M1 - 2743
ER -