Extending life expectancy of La Esmeralda reservoir: A bet to support Colombia's future energy demand

    Producción científica: Capítulo del libro/informe/acta de congresoPonencia publicada en las memorias del evento con ISBNrevisión exhaustiva

    5 Citas (Scopus)

    Resumen

    This work addresses the strategy of AES Corporation (AES Chivor) in order to extend the life of La Esmeralda reservoir to support Colombia's future energy demand. Chivor Hydropower Plant entered into service in 1978 and has a capacity of 1000 MW, 8 % of Colombia's demand. It is first described how the Colombian electricity energy mix is composed. Then, La Esmeralda reservoir, which is used by Chivor for power generation, is described; sediment management plans and maintenance costs for equipment and infrastructure are addressed. Then, sediment dynamics studies that have been done in order to determine life expectancy of La Esmeralda reservoir are listed. Such studies have been used to execute the Chivor's Life Extension Project, which considers the modification of intakes as the best option to extend the life of the reservoir for at least 50 years, among several alternatives that were evaluated by a panel of international experts. This represents a challenge from the engineering point of view, and the project will be shown as a successful example for a country with such dependence on hydropower generation. Modernizing existing infrastructure without affecting the operation, as in this case, is crucial to show how a sustainable sediment management plan and technological development are necessary to extend life of hydropower generation projects, and to help meeting energy demand in a sustainable way for countries such as Colombia with a growing economy.

    Idioma originalInglés
    Título de la publicación alojadaASME 2020 Power Conference, POWER 2020, collocated with the 2020 International Conference on Nuclear Engineering
    EditorialAmerican Society of Mechanical Engineers (ASME)
    ISBN (versión digital)9780791883747
    DOI
    EstadoPublicada - 2020
    Evento2019 Canadian Society for Civil Engineering Annual Conference, CSCE 2019 - Laval, Canadá
    Duración: 12 jun. 201915 jun. 2019

    Serie de la publicación

    NombreAmerican Society of Mechanical Engineers, Power Division (Publication) POWER
    Volumen2020-August

    Conferencia

    Conferencia2019 Canadian Society for Civil Engineering Annual Conference, CSCE 2019
    País/TerritorioCanadá
    CiudadLaval
    Período12/06/1915/06/19

    Nota bibliográfica

    Publisher Copyright:
    Copyright © 2020 ASME.