Transmission Expansion Planning Considering Grid Topology Changes and N-1 Contingencies Criteria

Diego Carrión, José Palacios, Manuel Espinel, Jorge W. González

    Producción científica: Capítulo del libro/informe/acta de congresoPonencia publicada en las memorias del evento con ISBNrevisión exhaustiva

    9 Citas (Scopus)

    Resumen

    In the present research, a new methodology is proposed to find the solution to the problem of transmission expansion planning in electrical power systems, considering changes in topology through the optimal transmission switching, N–1 contingencies and maximum chargeability of the lines; the proposed model considers optimal power flows DC to minimize operating and investment costs. In addition to this, the restriction of the problem is posed by not allowing demand rationing. The proposed methodology is applied in the IEEE 14-bus system in which several case studies were proposed, varying the maximum number of transmission lines that can be switched and as a result, the new lines that must be implemented in the SEP are obtained in a time of 5 years. The behavior of the power flows circulating through the transmission lines before and after the exposed methodology is also compared.

    Idioma originalInglés
    Título de la publicación alojadaRecent Advances in Electrical Engineering, Electronics and Energy - Proceedings of the CIT 2020
    EditoresMiguel Botto Tobar, Henry Cruz, Angela Díaz Cadena
    EditorialSpringer Science and Business Media Deutschland GmbH
    Páginas266-279
    Número de páginas14
    ISBN (versión impresa)9783030722074
    DOI
    EstadoPublicada - 2021
    Evento15th Multidisciplinary International Congress on Science and Technology, CIT 2020 - Quito, Ecuador
    Duración: 26 oct. 202030 oct. 2020

    Serie de la publicación

    NombreLecture Notes in Electrical Engineering
    Volumen762 LNEE
    ISSN (versión impresa)1876-1100
    ISSN (versión digital)1876-1119

    Conferencia

    Conferencia15th Multidisciplinary International Congress on Science and Technology, CIT 2020
    País/TerritorioEcuador
    CiudadQuito
    Período26/10/2030/10/20

    Nota bibliográfica

    Publisher Copyright:
    © 2021, The Author(s), under exclusive license to Springer Nature Switzerland AG.

    Huella

    Profundice en los temas de investigación de 'Transmission Expansion Planning Considering Grid Topology Changes and N-1 Contingencies Criteria'. En conjunto forman una huella única.

    Citar esto